The Ampa project required a high-capacity and well-structured dewatering system to support deep excavation activities under challenging conditions. With a total perimeter of 504 meters, effective groundwater control was critical for maintaining excavation safety and stability.
Prasanth Dewatering implemented a powerful and reliable dewatering solution to enable excavation up to a depth of 14 meters, ensuring dry, stable, and secure site conditions. Continuous monitoring and efficient system management ensured smooth project progress.
This project highlights Prasanth Dewatering’s capability in delivering high-performance solutions for deep excavation requirements.
Project Location
Aminjikarai, Chennai